Critical Path

    Critical Path (2026)

    TMDB 10.0/10 (1)

    Konusu

    Critical Path offers an exclusive, behind-the-scenes look at the engineering marvel that is the SpaceX Starship program. The documentary details the iterative design philosophy, the high-stakes testing, and the relentless drive to build the largest and most powerful rocket ever flown. From the first conceptual sketches to the atmospheric re-entry and landing attempts, this film chronicles the single, complex path of innovation required to make life multi-planetary.

    Ekip ve oyuncular

    Oyuncular: Justin Styer, Elon Musk, Tim Southerton, Bobby Peden, Jenna Lowe

    Nerede izlenir?

    Critical Path filmi şu anda Türkiye'deki dijital platformlarda yer almıyor.

    CineNav üyelerinin puanları, yorumları ve benzer öneriler için Keşfet.

    Cineman

    Cineman